South Street And Walter Street Intersections Reconstruction

We’re investing in safer, more accessible, and greener intersections along South Street and Walter Street between Fletcher Street and Hewlett Street in Roslindale.

Have questions? Contact:

Project Phase

Pending
Planning
Design
Construction
Complete

Project Information

Location
South Street between Fletcher Street and Hewlett Street Roslindale 02131
See all
Expected Year to be Completed
2026
Primary Project Type
Streets

Design

We're currently working on the design. We'll post the draft plans here soon.

Project highlights

To increase your safety, improve accessibility, and modernize our local infrastructure, we will:

  • Reconstruct sidewalks, crosswalks, and ramps. This will make walking safer and more comfortable for you. These updates will also meet accessibility guidelines.
  • Modernize traffic signal equipment and update signal timing. This will help you cross more safely and will manage vehicle traffic better.
  • Repave roadways, install high-visibility striping, and add new signage in the project area. These actions will bring these elements to a state of good repair.

Design details

SIDEWALKS AND ACCESSIBILITY

To improve your safety and accessibility, we will:

  • Rebuild all sidewalks within the project area. 
  • Upgrade all crosswalks to meet ADA accessibility standards, including:
    • Direct, unobstructed crossings.
    • ADA-compliant curb ramps.
    • Push-buttons with sounds.
  • Build curb extensions at most intersections. These will expand sidewalk areas, make space for wider curb ramps, and make it safer by slowing turning vehicles and improving visibility.
  • Keep existing features like seating and trees.
  • Create space on the sidewalk at the intersection of South Street and Roger Street for a new bike share station.
TRAFFIC, SIGNALS, AND LIGHTING

To improve traffic safety and flow for everyone, we will:

  • Install modern, energy-efficient LED traffic signals. These will include fiber optic connections for improved signal coordination, modern vehicle detection equipment, and software to manage traffic flow. 
  • Upgrade street lighting in the project area with new posts and underground wiring.
ROADWAY

To improve roadway conditions, we will:

  • Repave the roadway in the project area for a smoother surface.
  • Install fresh, high-visibility pavement markings.
  • Add an eastbound bike lane on South Street with shared lane markings in the westbound direction.
  • Update signs as needed throughout the project area.
ENVIRONMENT

To contribute to a healthy environment, we will:

  • Protect existing trees during construction.
  • Create new, low-maintenance planted areas to increase greenery and process stormwater runoff.
  • Manage stormwater runoff by adding or upgrading drainage systems throughout the project area, using green infrastructure.
PARKING

To address parking, we will:

  • Keep as much parking as possible while balancing needed safety improvements and required accessibility upgrades. We’ll share more details soon along with the draft design plans.